Sun-microsystems 2000E Instrukcja Użytkownika Strona 28

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 54
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 27
2-12 SPARCserver2000E Power SupplyInstallationManualApril1995
2
5. Install the bottom cover panel.
Position the panel Part No. 340-3190-xx and install 12 screws
Part No. 240-1372-xx to secure the panel to the cabinet. See Figure 2-11.g
Figure 2-11 Installing the Bottom Cover Panel
2.5.2.3 MainBusBarInstallation
Install the main bus bar Part No. 340-3136-xx to connect the top and bottom
power supply busses.
1. Orient the bus bar as shown in Figure 2-12.
2. Place the bus bar flush against the top and bottom power supplies so
holes in the tabs slide over all bolts on the supplies: eight on the top
supply and eight on the bottom.
3. Loosely install in the order given the following on each bolt: a flat washer,
a lock washer and a nut.
See Figure 2-12.
4. Loosely install four M6 screws through holes in the bus bar to secure the
bus bar to the top and bottom cover panels.
The screw Part No. is 240-2083-xx. See Figure 2-12.
5. Tighten all nuts and screws installed in Step 3 and Step 4.
Bottom cover panel
Part No. 340-2190-xx
Screws (12 places)
Przeglądanie stron 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 53 54

Komentarze do niniejszej Instrukcji

Brak uwag