Sun-microsystems SunSwift SPARCcenter 2000 Instrukcja Użytkownika Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 28
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
InstallingtheAdapter 2-5
2
2.5 Post-InstallationProcedures(Optional)
Perform the following tasks to verify and customize the performance of the
SunSwift SBus Adapter.
2.5.1 Watching Network Activity
Make sure that you are connected to an active network.
You can watch network activity or incoming network packets by typing
the following:
Note The network speed is the same as the speed of the hub to which your
system is connected. See Section 2.5.3 “Auto-Negotiation” and Section 2.5.4
“Configuring Driver Parameters” for information on speed selection.
2.5.2 Running Diagnostics
Refer to the SunVTS 1.0 Users Guide document for diagnostic tests for the
SunSwift SBus Adapter.
ok watch-net-all
/iommu@f,e0000000/sbus@f,e0001000/SUNW,hme@0,8c00000
hme register test -- succeeded.
Internal loopback test -- succeeded.
Transceiver check -- Using Onboard Transceiver, 100 Mbps Link
Down, 10 Mbps Link Up, passed
Using Onboard Transceiver, 100 Mbps Link Down, 10 Mbps Link Up,
Looking for Ethernet packets.
'.' is a good packet. 'X' is a bad packet.
Type any key to stop.
...........
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 27 28

Komentarze do niniejszej Instrukcji

Brak uwag